What should Transmission Owners instruct Generation Owners to follow if they haven't provided a voltage schedule?

PJM Default Voltage Schedule

When Transmission Owners need to instruct Generation Owners who have not provided a voltage schedule, they should direct them to follow the PJM Default Voltage Schedule. This schedule serves as a standardized guideline that ensures consistent and reliable management of voltage levels across the transmission network. By utilizing the default schedule, it helps maintain system stability and performance while minimizing operational discrepancies that might arise from individual generator practices.

The PJM Default Voltage Schedule is essential because it accommodates different generators' capabilities and ensures that the overall grid can respond effectively to varying load conditions and disturbances. Not having a specified voltage schedule from the Generation Owners could risk potential grid instability, making adherence to the default schedule critical for maintaining reliable service.

The other options, such as a reactive power schedule or a unity power factor schedule, pertain more specifically to power quality management rather than directly controlling voltage levels. A SCED dispatch signal relates to economic dispatch in real-time operations but does not address the absence of a voltage schedule directly. Therefore, the PJM Default Voltage Schedule is the most appropriate instruction in this scenario, ensuring compliance and system reliability.

Reactive power schedule

Unity Power Factor schedule

SCED dispatch signal